DOCS / PIPELINE NATIVE 4K · SCENE FIELD
Pipeline
Fourteen stages. Two human gates. Nothing is skipped.
Stages
- Research — Gather what's needed before anything is built.
- Manage AI agent fleet — Run, monitor and direct your agents from one place.
- Call Nimo APIs — Pull live data and capabilities through Nimo.
- Verify — Check every claim and output against its source.
- Search as of today — Re-check against the latest information, not stale memory.
- Ask AI for gaps — Have an agent list what's missing or weak.
- Fix gaps — Close each gap with a targeted change.
- Reaudit — Run the checks again to confirm the fixes held.
- Redesign — Rework structure and UI based on what the audit found.
- Plan final prototype — Lock the scope and shape of the build.
- Get human approval (human) — A person signs off before any build starts.
- Build — Produce the approved prototype.
- Deploy preview — Ship to a safe preview environment.
- Human verify for production (human) — A person confirms the preview before it goes live.
Human gates
Approval is required before any build starts, and again before production. The loop cannot continue without a person.